Risk factors for design and build projects in Malaysia – Project manager’s perception
Sabihah Saaidin1, Intan Rohani Endut2, Siti Akmar Abu Samah3, Ahmad Ruslan Mohd Ridzuan4.
The design and build concept has become a popular contract system. It requires the owner and contractor to identify, analyse and manage risks and search for the best solutions to improve performance. The objective of this paper is to identify the project manager’s perception of risk factors associated with the design and build project in Malaysia. A total of 100 usable questionnaires were received and analysed using mean ranking and factor analysis. The results show that three most risky factors are: “client financial capability”, “inadequate cash flow by contractor”, and “lack of payment (delayed progress payment by owner to the contractor)”. Risk can be grouped into 12 categories, namely: (1) lack of management competency; (2) lack of contractor experience; (3) political issues; (4) lack of standardized system; (5) unpredictable issues; (6) lack of client experience; (7) safety issues; (8) lack of teamwork; (9) poor supervision by client; (10) lack of client information; (11) material availability; and (12) design error.
Affiliation:
- Universiti Teknologi MARA, Malaysia
- Universiti Teknologi MARA, Malaysia
- Universiti Teknologi MARA, Malaysia
- Universiti Teknologi MARA, Malaysia
Download this article (This article has been downloaded 250 time(s))
|
|
Indexation |
Indexed by |
MyJurnal (2021) |
H-Index
|
3 |
Immediacy Index
|
0.000 |
Rank |
0 |
Indexed by |
Scopus 2020 |
Impact Factor
|
CiteScore (1.1) |
Rank |
Q3 (Agricultural and Biological Sciences (all)) Q3 (Environmental Science (all)) Q3¬¬- (Computer Science (all)) Q3 (Chemical Engineering (all)) |
Additional Information |
SJR (0.174) |
|
|
|