View Article |
Major functional risks for operation and maintenance of tunnelling projects
Yong, Siang Lee1, Farid E Mohamed Ghazali2.
Over recent decades, the world is witnessing a rapidly increasing demand
for tunnels due to their unique characteristics and potential applications
such as roadway and railway transportation. However it is not unusual for
any forms of risks to occur after tunnel completion and during operation and
maintenance stage. This paper reviews all the key major functional risks for
tunnelling projects from several case studies that have been carried out by
other researchers. As a result, a more effective risk management approach
can be added to the current operation and maintenance plan. And from there
also, a risk contingency plan can be established or added to current risk
management plan to enhance the operation and maintenance of tunnelling
projects.
Affiliation:
- Universiti Sains Malaysia, Malaysia
- Universiti Sains Malaysia, Malaysia
Download this article (This article has been downloaded 239 time(s))
|
|
Indexation |
Indexed by |
MyJurnal (2021) |
H-Index
|
2 |
Immediacy Index
|
0.000 |
Rank |
0 |
|
|
|