Assessment of cost escalation factors for building and civil engineering projects in Nigerian construction industry: a multiple regression approach
Nasiru Zakari Muhammad1, Keyvanfar, Ali2, Muhd Zaimi Abd Majid3, Shafaghat, Arezou4, Aliyu Muhammad Magana5, Hasan Lawan6.
Estimation of cost for building and civil engineering projects with minimum error at the conceptual stage of project development is crucial for planning. This paper evaluated the most significant cost escalation causing factors in building and civil engineering projects. Questionnaires were administered to clients, consultants and contractors to elicit information regarding their opinions with regard to these factors. Mean score value for each factor was determined. Also level of agreement of ranking of such factors between groups was investigated. The results of the analysis show that the most significant causes were the “Fluctuation of price of material” and “Variations” with the highest mean score values of 3.9 and 3.73 respectively. Also there was agreement in the opinions between all the groups with regard to these factors. A linear multiple regression models for the prediction of final cost of construction of building and civil engineering projects were developed using Statistical Package for Social Sciences (SPSS).
Affiliation:
- Universiti Teknologi Malaysia, Malaysia
- Universiti Teknologi Malaysia, Malaysia
- Universiti Teknologi Malaysia, Malaysia
- Universiti Teknologi Malaysia, Malaysia
- Bayero University Kano, Nigeria
- Kano State University of Science and Technology, Nigeria
Download this article (This article has been downloaded 125 time(s))
|
|
Indexation |
Indexed by |
MyJurnal (2021) |
H-Index
|
6 |
Immediacy Index
|
0.000 |
Rank |
0 |
Indexed by |
Scopus 2020 |
Impact Factor
|
CiteScore (1.4) |
Rank |
Q3 (Engineering (all)) |
Additional Information |
SJR (0.191) |
|
|
|
|
|