Development of magnetic wheeled boiler tube inspection robot
Abdul Jalal, M.F1, Mohamed Sahari, K.S2, Anuar, A3.
The periodical inspection of boiler header and tube is considered important to
avoid power plant shutdown due to failures caused by degradation, creep,
corrosion, thermo-mechanical loading and others. The boiler header inspection
robots developed by our research center, namely “MK-02” and “LS-01”, are only
able to inspect the boiler header but unable to travel in and examine the boiler
tube condition. This paper introduces a boiler tube inspection robot with
magnetic wheeled which is able to inspect the inner surface of 45 mm
ferromagnetic tube. The detailed design and analysis of Boiler Tube Inspection
Robot “ND-01”are presented. The experimental results proved that the proposed
system was able to work efficiently. With further research, the proposed design is
expected to improve the inspection of boiler tube or small pipe efficiency.
Affiliation:
- Universiti Tenaga Nasional, Malaysia
- Universiti Tenaga Nasional, Malaysia
- Universiti Tenaga Nasional, Malaysia
Download this article (This article has been downloaded 135 time(s))
|
|
Indexation |
Indexed by |
MyJurnal (2021) |
H-Index
|
6 |
Immediacy Index
|
0.000 |
Rank |
0 |
Indexed by |
Scopus 2020 |
Impact Factor
|
CiteScore (1.4) |
Rank |
Q3 (Engineering (all)) |
Additional Information |
SJR (0.191) |
|
|
|
|
|