Articles uploaded in MyJurnal |
|
|
View Article |
Risk variable on contractor’s tender figure in Malaysia
Sabihah Saaidin1, Intan Rohani Endut2, Siti Akmar Abu Samah3, Ahmad Ruslan Mohd Ridzuan4, Nur Nabihah Abd Razak5.
Construction industry like other industries is subject to risks due to the unique and complexity of the construction industries. It shows the risk exposure at highest level during the tendering process. The objective of this paper is to evaluate risk variable on contractor’s tender figure in Malaysia. To achieve the objective, questionnaire survey was conducted on G7 contractor in Malaysia. A total of 120 usable postal questionnaires was received. The findings have shown quality expectation, price inflation of construction materials, the risk involved in the project and financial capability of the client are most significant factors to be considered by contractors when estimating the pricing risks. The study recommended that competent contractors should be allowed to tender project as to see the risk variable inherent during tendering process that will affect project performance.
Affiliation:
- Universiti Teknologi MARA, Malaysia
- Universiti Teknologi MARA, Malaysia
- Universiti Teknologi MARA, Malaysia
- Universiti Teknologi MARA, Malaysia
- Universiti Teknologi MARA, Malaysia
Download this article (This article has been downloaded 139 time(s))
|
|
Indexation |
Indexed by |
MyJurnal (2021) |
H-Index
|
6 |
Immediacy Index
|
0.000 |
Rank |
0 |
Indexed by |
Scopus 2020 |
Impact Factor
|
CiteScore (1.4) |
Rank |
Q3 (Engineering (all)) |
Additional Information |
SJR (0.191) |
|
|
|
|
|