Issues of payment procurement process for industrialised building system (ibs) project
Natasha Dzulkalnine1, Khuan, Wai Bing2, Nurul Fadly Habidin3, Mohamed Nor Azhari Azman4, Abdul Rahman Ayub5.
This research paper intends to investigate the issues of payment procurement process for
Industrialised Building System (IBS) Project. There are many differences of payment
procurement process between conventional and IBS project. The IBS project requires
upfront payment as compared with conventional project. Up to this moment, there is no
single solution to this issue. Very often, the IBS contractor faces financial difficulty leading to
the bankruptcy and delaying in the project completion. Thus, a preliminary study was
undertaken with 21 samples of respondents that have a variety of background
occupational. The findings from the study revealed that the issue of payment for IBS
contractors comprises of five (5) main factors which are high initial cost, difficulty in
securing timely and adequate financing, lack of integration at design stage, difficulty to
get loans from financial institution and increment of material prices. Findings from this study
may help the decision makers including the government or Construction Industry
Development Board (CIDB) to formulate a new procurement process especially for the IBS
contractor. The findings will be used for the financial model framework for the IBS
contractor in the future.
Affiliation:
- Universiti Pendidikan Sultan Idris, Malaysia
- Universiti Pendidikan Sultan Idris, Malaysia
- Universiti Pendidikan Sultan Idris, Malaysia
- Universiti Pendidikan Sultan Idris, Malaysia
- Universiti Pendidikan Sultan Idris, Malaysia
Toggle translation
Download this article (This article has been downloaded 134 time(s))
|
|
Indexation |
Indexed by |
MyJurnal (2021) |
H-Index
|
6 |
Immediacy Index
|
0.000 |
Rank |
0 |
Indexed by |
Scopus 2020 |
Impact Factor
|
CiteScore (1.4) |
Rank |
Q3 (Engineering (all)) |
Additional Information |
SJR (0.191) |
|
|
|